Recieved:

25/08/2026

Accepted:

07/10/2026

Page: 

–

doi:

http://dx.doi.org/10.17515/resm2026-2255st0825rs

Views:

7

Integrating BIM and life cycle assessment for low-carbon renovation design of existing urban buildings

Jianliang Liang 1,2, Kenn Jhun Kam 1

1School of Architecture, Building and Design, Taylor's University, No. 1 Jalan Taylor's, 47500 Subang Jaya, Selangor, Malaysia
2Yunnan Design Institute Group Co., Ltd., Kunming, Yunnan, China

Abstract

Existing urban buildings require low-carbon renovation strategies that simultaneously address operational energy consumption, embodied carbon, life-cycle environmental impacts, and renovation cost. However, these dimensions are often assessed separately, while effective integration of Building Information Modeling (BIM) and Life Cycle Assessment (LCA) and selection of balanced renovation alternatives remain challenging. This study develops an integrated BIM–LCA framework for assessing and optimizing low-carbon renovation strategies for an existing university office and laboratory building in Tallinn, Estonia. Autodesk Revit 2024 was used to develop the parametric BIM model and extract material quantities, while DesignBuilder/EnergyPlus was employed to simulate baseline and renovation energy performance. The environmental assessment used the ecoinvent life-cycle inventory database and ReCiPe 2016 Midpoint method over a 50-year assessment period. The system boundary included material production, transportation, installation, component replacement, operational energy, and end-of-life stages. Renovation scenarios involving wall and roof insulation, window replacement, heating, ventilation and air-conditioning (HVAC) improvements, envelope renovation, photovoltaic (PV) integration, and combined measures were evaluated. Non-dominated Sorting Genetic Algorithm II (NSGA-II) was applied to identify Pareto-optimal alternatives considering annual operational energy consumption, embodied carbon, operational carbon, and renovation cost. The Pareto-optimal alternatives were then assessed using the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS), based on the specified criteria and weighting scheme. The selected compromise solution, SOL_040, reduced annual energy consumption from 793.3 to 276.66 MWh/year and Energy Use Intensity (EUI) from 186.22 to 64.94 kWh/m²/year, corresponding to a 65.13% reduction in both indicators, and reduced life-cycle carbon emissions from 11,117.5 to 7,394.40 t CO₂e, representing a 33.49% reduction. SOL_040 achieved a recalculated TOPSIS closeness coefficient of 0.6864. The findings demonstrate an integrated BIM, energy simulation, LCA, multi-objective optimization, and multi-criteria decision-making workflow for comparing renovation alternatives and supporting low-carbon renovation planning.

Keywords

Building Information Modeling; Life cycle assessment; Low-carbon renovation; Energy simulation; Multi-objective optimization; Sustainable building design

Cite this article as: 

Share This Article
LinkedIn
X
Facebook
journal cover
News & Upcoming Events