The aim of this study is to propose a framework for the Digital Twin-Lean Management (DTLM) by establishing a direct correspondence between Lean waste and BIM/IoT data, and enhancing project performance through operational decision-support actions. The original framework was assessed through simulation, and a field pilot study was then carried out to evaluate its effectiveness in a real construction scenario. The simulation-based assessment examined the impact on the performance of the project by changing the values of the input data using the One-at-a-time (OAT), the Sobol global sensitivity analysis, and the Monte Carlo simulation methods. The reported first-order Sobol sensitivity indices identified material delivery delay (0.36) and equipment failure probability (0.27) as the two dominant simulation input factors. The area under the total cost time curve was used as the metric of interest to evaluate the simulation results. Finally, the DTLM framework was implemented in the ongoing construction of a commercial building. A 29.7% reduction in crew downtime, a 21.9% reduction in material-handling distance, a 21.4% increase in labor productivity, and a 44.7% reduction in rework costs were observed relative to baseline levels, based on descriptive experimental comparisons. All results indicate the operational feasibility of DTLM for waste identification and timely decision-making, while further observational verification is needed to determine inferential effects in the field.